Retaining wall rebuilding in Toronto

Rebuilding a wall is mostly about what goes behind it. The blocks are the visible part and the easy part; the drainage stone, the separation from the soil and the outlet at the base are what decide whether the wall is still straight in ten years or leaning again in three.

  • Clear stone the full height
  • Blocks cleaned and reused
  • Setback per course, to the product

Behind The Face

A rebuild is a drainage job with blocks on the front

Saturated soil is roughly twice the load of dry soil, and in this climate it also freezes and expands.

A wall built with soil packed straight against the back of the blocks carries that load every wet autumn and takes that expansion every winter, which is why it leans within a decade no matter how neatly the courses were laid.

A rebuild puts clear stone the full height behind the face, wrapped so fines from the soil cannot migrate in and clog it, with an outlet at the base so water actually leaves rather than filling the stone up.

Add the correct setback per course, which leans the wall into the slope rather than away from it, and the blocks become the least interesting part of the job. Where the wall is above roughly a metre we ask for a drawing rather than guessing, because at that height it is an engineered structure.

See how a leaning wall is measured, what wall caps need on top, and how pooling water behind a wall is redirected.

Wall Rebuilding
Segmental block retaining wall built in stepped courses
A low retaining wall of large rough quarried limestone blocks holding back a planted bed

How It Runs

Four steps to a wall that stays where it is put

  1. Record the lean first

    A plumb line on the face tells us how far it has moved and whether the base slid or the top rotated, which are two different repairs.

  2. Take down and clean

    Blocks come off in courses and are cleaned as they go, because reusing them is most of the saving against building a new wall.

  3. Drain the full height

    Clear stone behind the face, separated from the soil, with an outlet at the base so water leaves rather than filling the stone.

  4. Rebuild to setback

    Courses rebuilt to line with the setback the block was designed for, then capped and adhered so the top course stops shifting.

Height And Drawings

When a wall stops being a landscaping job

Most municipalities set a threshold around a metre, above which a retaining wall becomes an engineered structure needing a drawing and often a permit. Rules vary and we do not guess at them: if your wall is near that height we say so and ask for the drawing rather than building to an assumption.

It is the one part of this work where being wrong is not just expensive. See what armour stone needs for the same reason, how a leaning wall is told from a bulging one, and what wall repair costs by face area.

A wall top where the cap stones have shifted out of line and one is missing, leaving the core open
About one metre Engineering threshold
A drawing is needed Above it
Asked, never assumed Rules

Common Questions

Wall rebuilding questions from Toronto owners

Asked on most visits for this kind of work.

No. The soil behind has already moved into the space the wall vacated. It has to come apart, the fill has to be corrected and it goes back up.
Usually most of them, and that is most of the saving against a new wall. Caps take the weather and are the ones most often replaced.
Around 300 millimetres of clear stone the full height, separated from the soil so fines cannot migrate in, with somewhere for the water to leave at the base.
Above roughly a metre, usually yes, and the threshold varies by municipality. We will tell you when your wall is near it rather than guessing.
Roughly $60 to $110 per face foot depending on height, access and whether the blocks can be reused. Armour stone prices differently because it needs equipment.
The soil comes back, the planting mostly does not, and we would rather say that plainly. Anything you want to keep is worth lifting and heeling in somewhere before we start. Established shrubs against a failing wall rarely survive the dismantling.

Homeowner reviews

What Toronto homeowners say

★★★★★ 4.9 · 127 reviews on Google
Read all reviews →
★★★★★

The wall was bulging and blocks were cracking. Rebuilt from the base with proper drainage and backfill. It has not moved.

Zack P.
Markham
★★★★★

Rebuild took four days and they kept the garden intact by staging the soil carefully. Wall is straight, plants survived.

Priya D.
Toronto
★★★★

They reused the sound blocks and only bought new ones for the failed courses. Saved money and matched the look.

Jill K.
Richmond Hill
★★★★★

Quote included the drain pipe and gravel behind the wall. That is the part the first builder skipped, and why it failed.

Dana S.
Oakville

Book a Look

Get a failing wall measured this season

A plumb line reading and half an hour tells you whether it has settled or is still moving.

Free written quote before anything is lifted.