Re-Levelling
Steps and Porches
Retaining Walls
Cleaning and Sealing
Service Areas
Get in Touch
Retaining Walls
Toronto retaining wall repair, drained and rebuilt
A wall that leans is telling you water is trapped behind it. Rebuilding the face without fixing what is behind gets you the same lean in three years, so the drainage is the job and the blocks are the easy part.
- Drainage stone behind every rebuild
- Blocks cleaned and reused
- Caps reset and secured
What Pushes It
A leaning wall is water, almost every time
Soil behind a wall is heavy. Saturated soil behind a wall is much heavier, and in Toronto it also freezes and expands.
If there is no clear stone behind the blocks and no way for water to leave at the base, every wet autumn loads the wall a little more and every winter pushes it forward. That is why a wall built without drainage leans within a decade regardless of how well the blocks were laid.
The rebuild puts clear stone the full height behind the face, wraps it so fines cannot migrate in, and gives water somewhere to go. See how a wall rebuilding is staged, what a leaning wall is measured against, and how pooling water behind a wall is redirected.
How It Runs
Four steps to a wall that stays put
-
Measure the lean
A plumb line on the face tells us how far it has moved and whether the base course has slid or the top has rotated.
-
Take down and save
Blocks come off in courses and are cleaned, because reusing them is most of the saving on a rebuild.
-
Drain and backfill
Clear stone behind the full height, separated from the soil, with an outlet at the base so water leaves rather than sits.
-
Rebuild and cap
Courses rebuilt to line with the correct setback per course, then caps reset and adhered so the top stops shifting.
Water First
Rebuild the face alone and the lean comes back
Every page under this hub comes back to what is behind the wall rather than what is in front of it. Saturated soil pushes, and a face rebuilt against soil that still holds water leans again within a few years.
So drainage stone goes behind the blocks and the base gets a proper footing, which is most of the labour and almost none of what you end up seeing. Above about a metre the work needs a drawing, and we ask for it rather than assume. A wall that moved once and then stopped may need nothing at all.
See what a leaning wall is telling you, how wall rebuilding runs course by course, and what wall caps let in when one is missing.
What This Covers
Retaining wall work we do in Toronto
Four ways a wall fails, and all of them start behind the blocks.
Wall Rebuilding
The wall dismantled, drainage installed and the courses rebuilt to line.
Learn moreLeaning Walls
Forward lean measured and corrected, with the cause behind it dealt with.
Learn moreWall Caps
Loose and missing caps reset and adhered so the top course stops shifting.
Learn moreArmour Stone
Large stone units re-set to line and level, which needs equipment rather than hands.
Learn moreCommon Questions
Retaining wall questions from Toronto owners
Asked on most visits for this kind of work.
They started by asking where the water behind the wall went. Nobody else did. The rebuild included a drain, and the wall is straight.
Repaired the leaning section, reset the caps and fixed the grade above it in one job. The wall looks like it was always fine.
Written quote with a drawing of the drainage and the geogrid layers. I understood what I was paying for.
Crew was careful with the machine on a tight lot. Wall rebuilt, lawn and fence untouched.
From the Guides
Toronto wall guides: lean, drainage and rebuilds
Book a Look
Have a moving wall measured this season
A plumb line and half an hour tells you whether it is settled or still going.
Free written quote before anything is lifted.