Paver base repair in Toronto

Base repair is what happens when levelling the surface is not enough. The compacted stone under the pavers has either washed out or was never deep enough for what crosses it, so it gets dug out, replaced and compacted in layers before a single paver goes back down.

  • Depth checked before quoting
  • Compacted in lifts, not one pour
  • Spoil removed, not spread

Depth And Load

Most failed base was built for the wrong load

A base is sized for what crosses it, and the two numbers that matter are depth and compaction. A pedestrian walkway can live on about 150 millimetres of well compacted granular; a driveway carrying a car wants closer to 300, and an area that takes a delivery van or a bin truck wants more again.

What we dig out is usually one of two things: a base that was correct once and has been washed thin by water moving through it, or a base that was never more than a few inches of screening tipped onto clay and raked level.

The second is common on surfaces laid as a weekend job, and it fails the same way every time, gradually and then all at once under a wheel. Rebuilding means removing the failed material rather than topping it up, because compacting new stone onto loose old stone just puts the soft layer deeper down.

See how a sunken paver area is lifted, what grading and slope changes above it, and what re-levelling costs once the base is included.

Base Repair
A paver surface opened to expose the compacted base beneath
A narrow paver walkway running away between two banks of tall grass

How It Runs

Four steps to a base that carries the real load

  1. Open a test spot first

    Before quoting we lift a small area and measure what is actually under there, because base depth is the single biggest variable in the price.

  2. Dig out, do not top up

    Failed material is removed rather than buried, since compacting fresh stone over loose stone leaves the soft layer intact a little deeper down.

  3. Build in compacted lifts

    Clean granular goes in and is plate compacted in layers, each one checked before the next, which is what gives the base its actual strength.

  4. Screed, relay and close

    A true bedding layer is screeded over the finished base, the pavers are reset to grade and the joints filled with new polymeric sand.

What It Costs

Why base repair prices as its own line

Base work is materials, labour and disposal, and it is the part of a job that can double the number once we see what is down there. So it is quoted separately from the paving rather than blended in, and we open a test spot before giving you a figure rather than after.

That way the range you get is built on what is actually under your surface. See how re-levelling cost is broken down, why edge restraint decides whether it holds, and what sunken driveways need beneath them.

Paver patio laid in a running bond with a contrasting border
As its own line Quoted
Opened before pricing Test spot
Material, labour, disposal Covers

Common Questions

Base repair questions from Toronto owners

Asked on most visits for this kind of work.

Around 150 millimetres of compacted granular under a walkway and closer to 300 under a driveway. Anything taking heavier vehicles wants more, and that is what we size it against.
Not if the old base has failed. Compacting new material over loose material leaves the soft layer in place a little deeper, and the surface settles again into the same spot.
A whole area dropping into a bowl is the base. Individual stones at different heights with no overall dip is the bedding layer above it, which is a smaller repair.
Yes, and that disposal is part of the quote. Spreading failed material across the lawn is how it ends up back under the surface a year later.
A properly built base outlives the pavers on top of it, which is twenty five years or more. The ones we dig out are almost never more than a few inches deep.
Not well. Compaction needs the stone at the right moisture, and saturated subgrade pumps instead of tightening. We would rather move you two weeks than build a base on ground that will not carry it, and we say so when we see it.

Homeowner reviews

What Toronto homeowners say

★★★★★ 4.9 · 127 reviews on Google
Read all reviews →
★★★★★

They lifted the sunken area and found the base was washed to gravel. Rebuilt it with proper stone and compaction, relaid, and it has not moved.

Carla F.
Markham
★★★★★

The base under the driveway was only two inches deep. They rebuilt it to the right depth and the sinking stopped for good.

Greg S.
Toronto
★★★★★

Compacted in layers with a plate compactor, not just raked flat. That is why the repair is still level two winters on.

Cole Z.
Richmond Hill
★★★★★

Showed me the old base material in a bucket so I understood why the pavers kept sinking. Then fixed it properly.

Ruth N.
Oakville

Book a Look

Find out how deep your base actually is

A test lift takes twenty minutes and it is the only honest way to price the work.

Free written quote before anything is lifted.