Paver base repair in Toronto
Base repair is what happens when levelling the surface is not enough. The compacted stone under the pavers has either washed out or was never deep enough for what crosses it, so it gets dug out, replaced and compacted in layers before a single paver goes back down.
- Depth checked before quoting
- Compacted in lifts, not one pour
- Spoil removed, not spread
Depth And Load
Most failed base was built for the wrong load
A base is sized for what crosses it, and the two numbers that matter are depth and compaction. A pedestrian walkway can live on about 150 millimetres of well compacted granular; a driveway carrying a car wants closer to 300, and an area that takes a delivery van or a bin truck wants more again.
What we dig out is usually one of two things: a base that was correct once and has been washed thin by water moving through it, or a base that was never more than a few inches of screening tipped onto clay and raked level.
The second is common on surfaces laid as a weekend job, and it fails the same way every time, gradually and then all at once under a wheel. Rebuilding means removing the failed material rather than topping it up, because compacting new stone onto loose old stone just puts the soft layer deeper down.
See how a sunken paver area is lifted, what grading and slope changes above it, and what re-levelling costs once the base is included.
How It Runs
Four steps to a base that carries the real load
-
Open a test spot first
Before quoting we lift a small area and measure what is actually under there, because base depth is the single biggest variable in the price.
-
Dig out, do not top up
Failed material is removed rather than buried, since compacting fresh stone over loose stone leaves the soft layer intact a little deeper down.
-
Build in compacted lifts
Clean granular goes in and is plate compacted in layers, each one checked before the next, which is what gives the base its actual strength.
-
Screed, relay and close
A true bedding layer is screeded over the finished base, the pavers are reset to grade and the joints filled with new polymeric sand.
What It Costs
Why base repair prices as its own line
Base work is materials, labour and disposal, and it is the part of a job that can double the number once we see what is down there. So it is quoted separately from the paving rather than blended in, and we open a test spot before giving you a figure rather than after.
That way the range you get is built on what is actually under your surface. See how re-levelling cost is broken down, why edge restraint decides whether it holds, and what sunken driveways need beneath them.
Related Work
Other re-levelling work in Toronto
Base repair almost always arrives with one of these.
Sunken Pavers
A dropped section lifted, the base corrected and the same stone relaid flush.
Learn moreUneven Pavers
Lipped and rocking stones re-bedded so the surface stops catching feet.
Learn moreSunken Driveways
Ruts, dips and a dropped apron corrected under the load a car actually puts down.
Learn moreSunken Patios
A settled patio lifted and re-pitched so water leaves instead of standing.
Learn moreUneven Walkways
Front paths and side yards relevelled where roots and frost have lifted them.
Learn moreCommon Questions
Base repair questions from Toronto owners
Asked on most visits for this kind of work.
They lifted the sunken area and found the base was washed to gravel. Rebuilt it with proper stone and compaction, relaid, and it has not moved.
The base under the driveway was only two inches deep. They rebuilt it to the right depth and the sinking stopped for good.
Compacted in layers with a plate compactor, not just raked flat. That is why the repair is still level two winters on.
Showed me the old base material in a bucket so I understood why the pavers kept sinking. Then fixed it properly.
From the Guides
Toronto base guides: depth, compaction and cost
Book a Look
Find out how deep your base actually is
A test lift takes twenty minutes and it is the only honest way to price the work.
Free written quote before anything is lifted.